urban developments in the arena put the housing problem that exists in the country. On such a basis, in Venelogía, there is a desire to help scale the problem by calculating the average price per m2 of construction and also, determine how minimum wages are required to buy a m2.
According to a study of more than 130 apartments for sale in the city of Cabriales, the area exhibits a higher price in the m2 of construction is the
more accessible areas in the city of Valencia as the price of construction m2 apartments in houses are
Average Price Maximum Price Minimum Price
The
Trigaleña8,531 6,450 10,800
Forest
7,721 6,555 10,869
7126 Los Mangos
8,227 5,802 | Fireplaces | ||
---|---|---|---|
Prebo | |||
Camoruco Valleys | |||
Bolivar Avenue | |||
Guataparo | |||
Vineyard | |||
The | Trigal | ||
The | Isabelica | ||
Flor Amarillo | |||
. | (These calculations are indicative market and are provided without any warranty.) | most exclusive areas | According to our analysis, the most exclusive areas of Valencia, with the price of m2 of construction |
The rest | Among the most accessible and the most exclusive areas are located 6 average price ranges between 5 000 and 7 000 Bolivars. These areas are | Av Bolívar, The Cornfield, Los Mangos, The Chimneys, Valleys Camoruco and El Parral | .|
Increase over last year | worth remembering that in 2009 had already calculated these prices to | 5 residential areas of the capital | Carabobo, in that sense, we see an increase in the average price of construction m2 . In the case of the Urb El Parral was increased 14.61% from Bs 6,152 to 7,051, in Urb La Trigaleña the variation was significant, 39.12%, from 6,132 to 8,531 Bs, in Urb El Bosque, the increase was 26.09% and finally, in Urb Los Mangos Bs.7.086 variation was from 7,126 to represent a marginal change of only 0.5%.|
Published at 06:45 AM on November 17, 2010 and not for other purposes, as it seems that has happened in some cases, "said Aquiles Martini, president of the union, after a meeting with members of the Committee on Administration and Services of the National Assembly. |
"We are requesting a hearing with the Commission on Domestic Policy of the National Assembly to find solutions to problems with public records to formalize. Some only accept between 5 and 10 documents for sponsor each week. That means an employer that has 500 homes will take at least 50 weeks in this process, "he said.
Congresswoman Laura Valls said that while the bill was pre-approved by the Commission, take into account comments Estate House. "The idea is to strengthen this instrument, which seeks to avoid the deviations that exist in the pre-and protect buyers, without stopping the construction of buildings. said he also expected the bill to regulate real estate, to see if the issue of presale will be included there or be treated separately. In any case, expected before the end of the year has a legal framework on the subject.
analitica.com