Saturday, December 18, 2010

Charles Chip Potato Chip Tin

The Peugeot RCZ Argentina reaches Aventador

is possibly the best prepared car aesthetically, and upon its release in Europe, began marketing in different regions. Soon it will be in Argentina, with a single engine and much equipment, but priced a bit high. Mainly

chosen motor to move the RCZ in Argentina is a 1.6 liter 200 bhp THP which combined with a six-speed manual gearbox .

Its main equipment is as follows:
  • Stability Control
  • automatic climate control alloy wheels 18 inches Leather Trim
  • Heated front seats
  • Trip Computer Cruise Control Power Pack
  • fog
  • variable steering
Other recommended retail price for the Peugeot RCZ in Argentina is about $ 200,000 .


Via: Autoblog

Can Alpha Trigger Ttl Nikon Flash

Lamborghini LP 570-4: Information and pictures leaked

few days ago had leaked two spy pictures in which we could observe the new Aventador 570 -4 LP, the latest sports car brand Lamborghini Sant'Aghata Bolognese. Also had leaked some information, which was on its engine. The engine used in the Aventador is a 6.5-liter V12 capable of carrying no more and no less than 700 hp peak power.



Looking information is revealed about the new Lamborghini LP 570-4 Aventador not only confirms the great work done by the brand to achieve a supercar the reach of very few vehicles.


reportedly Fitr, the new Aventador deliver the maximum power at 8,250 rpm , and be able accelerate from 0 to 100 km / h in just a few 2.9 seconds. As this is a maximum speed of 350 km / h. All this is thanks to its weight, which is only 1,575 kg . Is a good number considering the size of the vehicle and its engine.

also know that AWD will have a distribution of traction of a below 43% and 57% rear . To stop this beast will need good brakes, so that the mark placed carbocerámicos brakes, which is no surprise.

For its size this will be a little longer than the Murciélago, with 4.78 meters, and almost as wide and high, about 2.5 meters and 1.13 meters respectively.

More pictures of the filtered data


Via:

What Does It Mean When You Have Low Temperature

Renault Megane RS: Released in Japan

Japan a country where sports are compact territory controlled by Mitsubishi and Subaru, the French brand Renault has tried to sneak some units of the third generation Megane RS.
.
The basic features of Mégane RS are no changes from the versions sold in the UK, with the exception of the speedometer is not in miles, if not in miles (km / h).

With regard to your engine, this is the same as that used two-liter engine that develops nothing more and nothing less than 250 hp of maximum power.

Our price is 3,850,000 yen, or about € 34,819 at current rates.


Image Gallery Renault Megane RS
Third Generation


See more images

Via: Autoblog

Tuesday, December 14, 2010

When You Dream That You Lose Your Hair

house converted church house






Source: Tecnoculto.com



on DECEMBER 12, 2010



in


ART, CURIOSITY

,
AMAZING



Edited by Alvaro Paris

This is the church of St. James, in Utrecht (Netherlands) and was built in 1870.

Times change and the building has been sold to a company that modernized, making it a beautiful home.

Price: 2.3 million euros (3.14 billion dollars). Is not that beautiful house?

Iglesia convertida en casa-0001

Credit Creator For Poptropica

Another egg, bamboo is now

Source: http://www.plataformaarquitectura.cl Iglesia convertida en casa-0009

House Egg / Daihai Fei Iglesia convertida en casa-0005 By Alejandro Concha

Iglesia convertida en casa-0006 Egg House is a small house with two feet high made of bamboo, has a waterproof membrane under the skin of sacks full of sawdust and grass seed. In the spring, the seeds begin to germinate and the hut is covered in grass.

Iglesia convertida en casa-0007

The small cabin, has wheels, which allows this to be transported from one place to another, as the desire of its owner. Iglesia convertida en casa-0008

Iglesia convertida en casa-0002

more pictures and more information about the residence below.

Iglesia convertida en casa-0003

Iglesia convertida en casa-0004 Inside, the decor is very simple with a small bed, a table with books and a small tank of pressurized water for washing. The house is designed to serve the most basic needs in an economical manner.





This is how the owner made and built the house with a few assistants, using about $ 1.000 U.S. dollars.


The full article and photos HERE

Friday, December 10, 2010

Pound Cake Recipe Betty Crocker

Sudeban: Most banks meet the mortgage

Source: El Universal
Wednesday December 8, 2010 11:07 a.m.
Caracas .- The Superintendent of Banks, Edgar Hernandez Berhens, said today that most domestic banks comply with the housing loan portfolio, while not ruling that investigations be initiated to determine whether there has been any wrongdoing by a financial institution, for example, that even when resources are not Be willing to provide financing.
"Sudeban receive monthly reports of all banks, is a report that we passed each of the financial institutions. So far compliance with the mortgage loan portfolio meets most financial institutions, "he said.
Yesterday, President Hugo Chavez has again threats of eminent domain against those institutions to block or delay the approval of mortgage loans to affected by irregularities estate.
Hernández Behrens said the allegations of the President are that there are institutions that are refusing to grant the funding, "we and other research institutions are going to do."

Monday, December 6, 2010

Discipline Paddle Teacher

public housing construction fell 76% in 4 years


As of September were 11,000 houses, 46,600 were made in 2006


Source: ARMS MayThe

H.

public sector units slows.




The State in the period from January to September 2010 completed 11,000 homes, but in the same period in 2006 (one of the most productive stages) made 46,600 homes, which shows In four years the realization of housing solutions by government agencies fell by 76%.

The National Executive announce construction fell from 120,000 units a year to the completion of pending home, and every year there are fewer solutions culminate. One reason for this situation is that the investment has been insufficient and the resources have been implemented slowly.
Impulse half
In 2005 the Government stated that beginning stage and boost the housing sector under that argument, the president noted that construction would amount to about 120,000 units. Given that goal diversified sources of funds for the activity, so that the manufacturing units not only was subject to recurrent expenditure, would also receive the excess resources.
That year there was an emergency in the sector by the rains and to address the risk areas were created special construction plans, among whom was the program to Caracas, which envisaged the completion of 17,000 solutions by Ministries of Housing, Infrastructure, Basic Industries, Environment and PDVSA. In the end the authorities ended up by about 21,000 homes.
was in 2006 when more units were completed. In that year the emergency in the housing sector by the end of the rainy season and again extended the Government, which resolved to make more than 100,000 units, the final 50% was met and although the goal was not reached, until now has been the year in which most houses are made.

For 2007 the official bodies responsible for implementing housing solutions down the pace, and made 10% fewer units than in 2006. In 2008 housing was more critical, and although it was a year of booming oil revenues, making the executive completed 23,000 homes. In 2009 there was a slight recovery in production and 30,000 homes were made.

Anyway completion of units away from that recorded in 2006 by the lack of additional investment and because the recurrent expenditure was run slowly, which were added the problems with procurement processes.

slowness persists
In 2010 the slowdown in construction has been higher. In nine months, the official authorities made 11,000 solutions, 56% less than the same period in 2009.

During the year, the President has expressed in his speeches that will address the housing shortage and the search for solutions in the book "Contribution to the Housing Problem" by Federico Engels. Last September, Hugo Chávez even said that "the problem is not solved inherited conflict and is one of the hardest", to which adding that "I will make every effort to meet the needs of the population putting into practice methods and strategies with great creativity. "

But official bodies have been built less for lower public spending. The executive began delivering additional income to the activity last November, when he decided that $ 1.5 billion (6.4 billion Bolivars) the issuance of PDVSA would be channeled towards the construction, which is supplemented by a contribution of the VCB VEB 500 million.

The slowdown also comes at a stage in which the Government has to deal with the emergency caused by the rains that has left homeless family groups nationwide. Officials say construction will be promoted, but the actions are focused on creating laws that create greater control in the production process.

Saturday, December 4, 2010

Does It Take A Week To Receive Mail In California

How to sell


Source: Venezuela Yellow Pages www.pac.com.ve
The real estate market Internet in Venezuela has like the classifieds in print and great ally for help in buying, selling and renting apartments, homes, offices and shops. To show a more effective and detailed data on the properties for sale, and to facilitate the search according to the characteristics of the properties offered. First, determine its value based on market factors, and income replacement. Carefully consider the location of the property and compare with others in the area, conduct a study with similar properties sold in immovable registry.
also call to a professional appraiser to do a assessed to the property and thus can sell at a fair market price.
also perform a thorough inspection of the property to determine what type of repairs and renovations should do and what the estimated cost thereof for which the property is considered the most attractive of which are being sold in the area.

addition, when you start getting calls to buy, keep in mind that many will be curious or friends than others, investigate and filtered before being given access to the property.

On the other hand, we must organize the originals of all tax bills, water, electricity and telephone.
sure that everything has been paid and if no payment.
Similarly, archive copies of all original documentation and only deliver to the notary that the buyer designates.
Finally, having a client and begin the final negotiation process, be careful to translate everything into a written agreement (option), do not miss any detail, specifying dates and amounts without any doubt. The same applies when you go to write the final document of sale. Verify that the check is properly delivered before signing the final document (confórmelo a day in advance). You can advise or hire someone with experience in selling real estate.

Thursday, December 2, 2010

Tobradex For Genital Wart

a building could rise 25% in tax Valencia real estate

Source: Carabobeño
December 1, 2010
(Photo Archive)

Valencia (EDIT) .-

President Valencia City Council , Pablo Montoya, said the property tax could be increased by 25 percent, because that is the amount of inflation projected for next year by the Government.

The increase will be fixed when punished Ordinance Urban Real Estate Tax. The mayor proposed that the increase is 60 percent, but the decision will the council in accordance with the reality of the country.
Montoya said that for now 25 percent is being discussed with the legal advisory council and the various communities.

The mayor noted that this tax has not changed since 2008. They have to pay both property used for housing and for commercial use.
(BR)

Bump With Little Black Dots On Foot

Emergency Act regulates sales and housing construction

Source: El Universal

H. MayThe WEAPONS
Wednesday December 1, 2010 12:00 AM
The Government allocated to the National Assembly Emergency Bill Urban Land and Housing, in addition to providing ways to deal with emergencies, said public utility idle urban land and regulates the process of construction and sale of housing solutions.

The president on Monday, said the text was intended to allow government agencies to address the emergency housing in the area, as reported today by the rains, but the proposal goes beyond because it has among other objectives to control the manufacture of units and set the parameters for the offer.
media production now houses the public interest and private property become public interest.

Special Areas

The proposal, already approved in first reading by Parliament, contains some of the provisions of previous decrees emergency housing.

The text states that the State may order the establishment of emergency zones for the occupation of urban land unsuitable for housing, allocate land and provide solutions for family groups, and self development plans, improvement and expansion of submit housing communities.

To supplement these provisions, the draft declares of national interest and priority to the implementation of plans for the allocation of housing units. The official authorities may carry out: the occupation of property that are in a state of neglect, acquire property to be awarded on a temporary basis by direct purchase homes.

Mayor

control
This project extends the maximum prescribed in the Law on the Housing and Urban Land Law in monitoring the construction sector.



law indicates that aims to accelerate all actions to ensure the right of families to adequate housing and it says that the state should have inter alia the establishment of "benchmarks and price band of a square meter of land and housing construction, according to the structure corresponding cost. "

A pricing, it adds that to "establish the basis for housing development, is concerned the use of all public or private land with a vocation for the construction of housing that are idle ".

That involvement includes: property owned by the Republic, wasteland of the Republic and municipal land. Private property, which are subject to compliance with the public interest nature under the law.

's lawyer, José Vicente Haro, explains that in the case of private property, they will be consistent with the purposes of the State, that means that if a building ready for office and the priority is housing, property will be transformed.

Coupled with the involvement, the draft states that "when execution of a work being classified as urgent will proceed to the occupation of the land prior to its execution."

Currency
construction

The Emergency Bill, the Government regulates the pre-and creates the currency of Construction as official value index for real estate transactions.

Although the Government last year banned the collection of consumer price index in pre-contracts, now creates a new indicator, the report said, will be adjusted each year by the Urban Land Institute and increase will take into account the studies linked "to the factors that affect average costs for housing."

The proposal states that "all option contracts for sale of houses under construction stipulate currency price in Construction ". Contracts must also include the delivery of works and the notarization of the document. The sale options have a term of 120 days.

While there is a parameter for the costs, the law maintains the ban on collecting the price index. The sales will be exempt from VAT.

The text also deals with leases and notes that in those buildings under the lease, and which have been acquired by the Executive, there will be a preferential right to purchase.